How to install solar panels step by step

avatar
smith jones
How to install solar panels step by step

We are going to explain to you how to install a solar panel system in your home and what to do, from the project to start-up and registration.

Throughout the article, we are going to discuss the following topics:

How the installation of solar panels is carried out

Solar panel prices

Obtain a proposal based on the possibilities of housing and consumption. This step, which involves sizing the system correctly for your needs, is key to obtaining a good return on your investment. If you install more, you invest excessively, if you install less, you let possible savings slip away.

Let the professionals carry out a prior study to see if all the requirements for the installation of Solar Panel Sydney are met and to be able to select the installation

Submit all documentation to the city council and pay the corresponding fees, taking into account the aid and subsidies available.


How the installation of solar panels is carried out


We explain the methodology, step by step, on how photovoltaic solar panels are assembled.

However, we must keep in mind that it is a meticulous process and that it must be done with the greatest care by the responsible technician to guarantee the optimal functioning of the system and avoid future problems.


First step: mount the supports of the photovoltaic installation

Before placing the solar panels on the roof, it is necessary to place the supports for them on the roof.

Depending on its typology and inclination, the type of structure to be used will vary.

For example, the support structure will not be the same in a roof whose modules are placed coplanar to it, that is, one that takes advantage of the inclination of the roof itself, as in a flat roof in which the modules must be tilted in one direction. certain way to obtain the greatest possible efficiency of the system.


Second step: Fixing the cover and solar panels


Once the structure is located, it must be fixed to the roof and the photovoltaic panels placed on it.

Depending on its typology and inclination, this process is carried out in different ways.

The most common thing is for the roof to be inclined (in Australia the vast majority of roofs are inclined between 20º and 35º , which favors the performance of our installation) and made of Arabic tiles, however, a different case may occur, such as tiles. of slate or flat roofs covered with asphalt fabric, among others.


Once the structure is anchored on the roof, the modules are placed and fixed to it after which they are interconnected with each other, to finally be connected to the investor.

Installer assembling solar panels

Third step: Connection to the electrical inverter

The connection between Solar Panel in Australia made in series between the modules of the same row or string, and in parallel to connect the rows to each other depending on the panels/inverter configuration.

This is done using the connectors to link the modules in parallel, or directly to the inverter.

Finally, a parallel connection is made, which can be made directly in the inverter, thus completing the direct current (DC) part of the installation, and thus all the energy collected by each panel is conducted through solar radiation in form of electric current to the inverter, which will be located at a point near the home's electrical panel.

To finish the installation, the inverter is connected to the electrical panel, as if it were a separate circuit from the home, thus completing the alternating current (AC) installation part.

Fourth step: Connecting the batteries

First, you must have a hybrid inverter, capable of managing the charging and discharging of the batteries, as they are the most expensive and delicate element of the system. 